Process optimization being the need of the hour, it was intended to increase the concentrate admixture production from 10,000 TPA to 20,000 TPA. CEPL performed the plant expansion study for the existing facility. It was observed that by reducing the batch cycle time, the production capacity can be increased. CEPL suggested reducing the batch cycle time from 6 hours to 4 hours by installing higher-capacity pumps. Revamping the existing pumping facility and providing additional filling stations, the batch cycle time reduced, thereby increasing the production capacity as per requirement.