Stress Analysis for EPC of replacement of 08ESDV100 and associated hydraulic package at Qatar Gas.

Client:

Petrocon ECC, Qatar

Type:

Detail Engineering

Disciplines:

PI

Scope:

  • An old 7 T ESDV was to be replaced with a new 9 T ESDV.
  • Stress for the existing system with additional load was studied in Caesar II.
  • Piping support requirement was studied and recommended to the client.

Industry:

Oil & Gas Industry