EPIC for various Pipeline PCRS In Dukhan

Client:
Qatar Petroleum / Qatar Design Consortium

Scope:

To provide detail engineering study in Aspen HYSYS V10 for
 Hook- Up of Pig Launcher and Receiver at Khatiyah North Degassing Station.
 Interconnection between 18” High Pressure Gas Lift Discharge to 32” Gas Lift Suction Header at Jaleha Main Degassing Station.
 High Pressure Gas Lift Header Modification for Pigging at Diyab Manifold

Industry:

Oil & Gas Industry