EPIC For 11 nos. non-shut down PCRs at NGL Plants, Mesaieed Operations

Client:
Qatar Design Consortium/ Qatar Petroleum, Qatar

Scope:

  • To Provide Backup Fuel Gas Supply To NGL 4 Flare Pilots (Non-Shutdown): Preparation of CV, PRV (Pressure Relief Valve ) & Restriction Orifice Sizing Calculations, preparation of data Sheets for Pressure Relief Valve, Self-Regulating Valve, Restriction Office
  • Modification of Fresh Water Piping Circuit for Safety Showers: Hydraulic Analysis using Bentley WaterGEMSwith CV Sizing, preparation of data sheets for Pressure Relief Valve, Self-Regulating Valveand Rupture Disc.
  • ESDV Installation At NaphthaR/D LINES: Preparation of TRV (Thermal Relief Valve) Sizing Calculation & data sheet.

Industry:
Oil and Gas.