Feasibility study to increase the productivity of oil producing wells

Client:

Tata Consulting Engineers, India

Type:

Concept Study

Discipline:

PR

Scope:

  • Production fluid from various wells are processed at a central processing terminal, which has 2 separators in series.
  • It has been observed that the second stage separator is redundant, as most separation occurs in first stage separator.
  • Aspen HYSYS Dynamics simulation model was prepared to study the existing system and proposed system.
  • The increase in the throughput was one of major output from this study.

Industry:

Oil & Gas Industry